This report contains the detailed account of the Fabrication of Formula 1 car by the students of  Ambalika Institute. The fabrication work took place at the college premises itself.

Day 1: 17-06-2016

  • Steel pipes arrive at 4:00 PM in college premises (Workshop).
  • Measurement of pipes.
[mk_gallery images=”2394″ column=”2″]
  •  Cutting of Pipes
  • Arrangement of cut members on the prepared fixture
[mk_gallery images=”2395″ column=”2″]

of base till 3:30 AM

[mk_gallery images=”2396,2397″ column=”2″]

Day 2: 18-06-2016

  • Welding of cut pipes using Welding machine available at the college.
[mk_gallery images=”2398″ column=”2″]
  • Only one welding machine was used.
  • All types of safety measures were taken into consideration.
  • Grinding of pipes through Hand Grinder.
  • Bending of pipes using Bending machine in workshop.
[mk_gallery images=”2399″ column=”2″]

Day 3: 19-06-2016

  • Work started at 7:30AM
  • 2nd coating of welding was done to provide more strength to the chassis.
[mk_gallery images=”2400″ column=”2″ image_size=”full”]
  •  Final chassis is ready.
  • Mounting Point decided on chassis.
[mk_gallery images=”2401″ column=”2″]
  •  Manufacturing of C- Brackets
[mk_gallery images=”2402″ column=”2″]
  •  Performing Strength Test
[mk_gallery images=”2403″ column=”2″ image_size=”full”]
  •  Base of chassis was covered by sheet metal
[mk_gallery images=”2404″ column=”2″ image_size=”full”]

DAY 4: 20-06-2016

  • Mounting points decided and C-brackets are welded.
[mk_gallery images=”2405″ column=”2″ image_size=”full”]
  • Tata Nano is purchased for its part.
[mk_gallery images=”2406″ column=”2″]
  • Preparation of A-Bar Arm of Suspension
[mk_gallery images=”2407,2408,2409″]
  •  Assembly of A- Bar Arm Suspension
[mk_gallery images=”2410″ column=”2″]
  •  Suspension mounting
[mk_gallery images=”2411″ column=”2″]